Hydraloop Post Treatment Unit datasheet

Updated 2026-07-06

First page of 20260528 PTU Datasheet

Context

This datasheet provides detailed information about the Hydraloop Post Treatment Unit (PTU), which is integral to the Hydraloop Cascade setup.

The PTU functions as a combination of an external storage tank, disinfection station, and distribution unit, ensuring efficient greywater recycling.

Prerequisites

Before using this document, ensure you have a basic understanding of greywater recycling systems and their components.

Familiarity with electrical and plumbing specifications will help in comprehending the technical details provided in this datasheet.

Maximize Your Use of This Document

Utilize the performance and capacity details to assess if the PTU meets your specific needs for recycled water usage.

Refer to the disinfection system information to understand the requirements and best practices for maintaining water quality.

Download

PDF ยท 1 MB

Download PDF

Having installation issues?

Our support team is ready to help you out.

TroubleshootContact Support